Changelog
A record of the documentation’s development and future revisions.
Stage 03.3 · Approval-readiness audit
The reviewed audit is internally accepted planning evidence for a bounded Release 1.0 Approval Candidate. The audit report is committed; its documentation/status closeout and stakeholder presentation work have since been completed. The browser-based review is the primary presentation, with the PDF and editable HTML as supporting archives. Company approval remains pending.
Stage 03.2 · Initial reusable components
Implemented Button, Link, Text Input and Form Field with scoped CSS Modules, working documentation and focused regression checks. Their existing component-level working treatments are internally accepted for Release 1.0. Specialist and application-specific validation and final company approval remain pending.
Stage 03.1 · Component architecture and inventory
Recorded the reusable architecture and 32 assessed inventory entries, including future component and conditional application candidates. The inventory is a roadmap, not a requirement to implement every entry for Release 1.0.
Stage 02.4B · Development dependency security review
Investigated F-02 and documented the development tooling advisory, constrained exposure and remediation options. The investigation did not change dependencies or close the advisory.
Stage 02.4A · Reproducible regression baseline
Implemented portable core checks and reproducible managed-browser smoke tests, addressing the initial F-03 testing gap. Automated checks are representative evidence, not specialist accessibility or production certification.
Stage 02.3B · Documentation corrections
Corrected F-01 current foundation overview and status wording, refreshed onboarding and extended the changelog through Stage 02.3A while preserving historical reports.
Stage 02.3A · Consolidated Visual Identity Audit
Completed the source, consistency and technical audit of all nine working foundations. The report records P0: 0, P1: 0, P2: 5 and P3: 1, with accepted exceptions and release-validation conditions distinguished from confirmed defects.
Final company approval and specialist release validation remain pending. These milestones record documentation development, not production component readiness or corporate website deployment.
Stages 02.2A through 02.2I · Visual Identity foundations
- 02.2A: Logo. Original complete assets, clear space, provisional sizes, usage guidance and full-page capture/PDF export support.
- 02.2B: Colours. Source palette, semantic roles, contrast references, status demonstrations and copyable values.
- 02.2C: Typography and writing standards. English and Arabic specifications, local font specimens and the project-wide punctuation convention.
- 02.2D: Spacing and Layout. Spacing scale, responsive grids, densities, digital containers and physical-layout references.
- 02.2E: Geometry. Structural shapes, radii, borders, dividers, restrained elevation and focus guidance.
- 02.2F: Iconography. Source-defined meanings and specimens from exact lucide-static 1.59.0 assets, separate from existing application Lucide React usage.
- 02.2G: Photography and Imagery. Direction, conditional crops, provenance and rights guidance, with labelled schematics pending authorised photographs.
- 02.2H: Illustrations and Graphics. Functional visual explanations and developer guidance, retaining the canonical Graphics route and Illustrations redirect.
- 02.2I: Architectural Motifs and Patterns. Recorded the internally accepted decision not to adopt a supplementary decorative motif system.
All nine pages are implemented as working documentation references. Their examples do not constitute a reusable production component library or final company approval.
Stage 02.1 · Working specifications
Applied centralised colour, typography, spacing and geometry tokens to the documentation shell, retaining the text-only header and original mobile-menu backdrop. Detailed foundation pages and logo demonstrations were deferred at that stage and subsequently implemented in Stages 02.2A through 02.2I.
The specifications remain internally accepted working references, pending final company approval and further implementation validation.
Stage 01 · Documentation foundation
Initial documentation architecture, navigation, responsive layout, and placeholder routes.
These are development milestones, not records of company approval or deployment.